Borynia-Zaofiówka-Jastrzębie Mine, “Jas-Mos” Section

The works included delivery and construction of a system for the production and feeding of sealing compounds based on salt water and fly ash with the addition of substances available in the mine. The system features a pipeline on the surface, in the shaft and in the underground headings,...

KWK Sośnica-Makoszowy Hard Coal Mine, “Sośnica” Section

We were responsible for the construction of an ash-water mixture station at shaft VI for the KW S.A. hard coal mine, KWK “Sośnica-Makoszowy” branch, “Sośnica” section. We carried out the following works under the project: Stage I: development of the complete, multi-discipline technical documentation – construction design – obtaining...

KWK Centrum Hard Coal Mine

Delivery and installation of a container station for ash feeding for the Spółka Restrukturyzacji Kopalń S.A. hard coal mine, KWK Centrum branch. 1) The complete system consisted of three main elements: pump and approx. 170m long pressure pipeline for underground-process water, production section – a container with the Mobile...

Brzeszcze Mining Plant

A system for the production and transport of an ash-water mixture to underground headings with the unloading station for road tankers in the area of the “Andrzej II” shaft at the Brzeszcze mining plant. 1) The industrial area is covered with a sandwich panel, in which there are: system...

Nowatorskie technologie

Jesteśmy specjalistami w zastosowaniu najbardziej zaawansowanych procesów wytłaczania rur.

Ciągły rozwój

Dziś jesteśmy lepsi, niż byliśmy wczoraj. Tworzymy nową wartość, zmieniamy na lepsze.

Wysoka jakość

Nigdy nie jest przypadkowa, zawsze powtarzalna. To wynik inteligentnego wysiłku.

Zadowoleni klienci

Czyli nasza najlepsza referencja. Indywidualne wymagania potrzebują dopasowanych rozwiązań.