Systemy podawania pyłu

Brzeszcze Mining Plant

A system for the production and transport of an ash-water mixture to underground headings with the unloading station for road tankers in the area of the “Andrzej II” shaft at the Brzeszcze mining plant.

1) The industrial area is covered with a sandwich panel, in which there are:

  • system for the production of a homogeneous ash-water mixture with a capacity of at least 100m3/h of ready mixture at density g=1500kg/m3,
  • process water pump with a hydraulic installation, supplying water to the mixer from the tank, equipped with measuring and control devices (flow meter),
  • mixture tank with a capacity of Q=3m3 with a washing system,
  • mixture pipeline equipped with measuring devices (flow meter and density meter),
  • pump unit transporting the prepared mixture to the “Andrzej II” shaft,
  • compressor for the equipment of the storage silos (dust extraction and aeration system),
  • air-conditioned operator’s cabin equipped with a computer with a control and monitoring system,
  • staff rooms.

2) Set of three storage silos with a total capacity of 240m3 for ashes, with a built-in safety system for arching of bulk materials.

3) System for measuring the right amount of ash with the mixing unit feeding unit.

4) Transport system for fly ash from the three storage area located in front of the hall (screw conveyors with adjustable ash capacity).

5) Process water tank with a capacity of 500m3.

6) Power supply installations with transformer stations.

7) Pipeline trestle bridge for the mixture.

Nowatorskie technologie

Jesteśmy specjalistami w zastosowaniu najbardziej zaawansowanych procesów wytłaczania rur.

Ciągły rozwój

Dziś jesteśmy lepsi, niż byliśmy wczoraj. Tworzymy nową wartość, zmieniamy na lepsze.

Wysoka jakość

Nigdy nie jest przypadkowa, zawsze powtarzalna. To wynik inteligentnego wysiłku.

Zadowoleni klienci

Czyli nasza najlepsza referencja. Indywidualne wymagania potrzebują dopasowanych rozwiązań.